News

POWER FAILURE: TUC JUSTIFIES REASONS/CAUSE FOR NATIONWIDE DARKNESS

…Spokesperson: 330kV DC transmission line tripping cause of outage in North-east, others

By Dele Ogbodo                                                 

FIRS Ad

The General Manager, Public Affairs, Transmission Company of Nigeria (TUC), Mrs. Ndidi Mba, on Tuesday 22/10/2024, advanced reasons for the recent power outages and failure of electricity across some parts of the country.

As we go to press, Abuja, is still submerged in total darkness.

She said: “Transmission Company of Nigeria (TCN) reports that its 330kV Ugwaji–Apir Double Circuit transmission lines1&2, tripped due to a fault, resulting in a forced power outage affecting the North East, North West and parts of North Central.

NCC Ad

“At approximately 4:53am, the Ugwuaji–Makurdi 330kV Line 2 tripped and 243 MW on that line was transferred to Line 1 on the same route. At 4:58am, Line 1 also tripped, resulting in a total loss of 468 MW. By around 5:15am and 5:17am Line 1 and Line 2 were tried, but they all tripped immediately on the same relay indication.”

Following the tripping incidents yesterday (Monday), Mba, said two teams of linesmen were dispatched. One from the Apir Transmission Sub-region and another from the Enugu transmission to expedite fault tracing along the 215 km route, which includes 245 transmission towers.

Throughout yesterday, the Apir team patrolled the line, navigating challenging terrains in search of the fault, reaching as far as the River Benue. They were unable to locate the cause of the tripping and have continued in the fault tracing early this morning.

Meanwhile, she added that the lines patrol team from Enugu Region of TCN were unable to commence lines patrol yesterday due to the ‘sit-at-home’ directive in the South-east for October 21st and 22nd, 2024.

This hindered not only the patrol team but also made it difficult to refuel patrol vehicles for the long distance line trace.

Arrangements were, however, made for security operatives to guide the team, who have commenced fault tracing this morning.

Currently, TCN has restored supply to the 132kV transmission line from New Haven to Apir, but the 330kV lines remain out of service, impacting power supply in the Northern region of the country. Sadly, the TCN Shiroro-Mando transmission line is also down due to security reasons, causing power outage in the North.

She said: “TCN is making every effort to trace the cause of the outage to enable our engineers effect repairs and restore bulk power supply through both lines.

“We sincerely apologize to the government and electricity consumers in all the affected states and acknowledge that our patrol teams would have continued their search into the night yesterday, if not for the challenging terrain, which includes swamps and rivers, as well as insecure areas in the forest. We reconvened very early this morning with security operatives and have continued the fault tracing to locate and address the cause of the line tripping.”

Related Posts

Egbin Fire Incident Cause of Load Shedding in Lagos

Extraordinaire News

FG Dissolves Board of Citizenship and Leadership Centre

Extraordinaire News

GAIDAM TASKS POLICE MINISTRY TO ACTUALIZE TINUBU’s MANDATE ON POLICING

Extraordinaire News

Ex Minister to Headline Stakeholders’ Engagement on Nigeria’s Preparedness for Climate Change Mitigation/Dialogue

Extraordinaire News

BOBRISKY IN FRESH STORM…AS FG ORDERS INVESTIGATION INTO HIS ALLEGED BRIBERY AT IKOYI CORRECTIONAL CENTRE

Extraordinaire News

NUHU RIBADU: GROUP ACCUSES FORMER GOV OF VINDICTIVE MISSION

Extraordinaire News

Najatu Mohammed: Why Police Service Commission Replaced Commissioner with AIG Bawa Lawal

Extraordinaire News

AATF DONATES STATE-OF-THE-ART EQUIPMENT TO IAR TO ENHANCE RESEARCH, SEED STORAGE

Extraordinaire News

Kuje Attack: Aregbesola Inspects Facility, Stresses Inter-agency Cooperation against Future Attacks

Extraordinaire News

Leave a Comment

* By using this form you agree with the storage and handling of your data by this website.